| Client | NHS Hospital |
| Location | Surrey |
| Services | Electrical Installation Emergency Lighting Structured Cabling Rapid Turnaround |
| Date | 2025 |
The Challenge
Surrey & Sussex Hospital needed a rapid electrical installation for newly built modular units designed to accommodate 64 additional patient beds. The project had a tight deadline, as the extra capacity was urgently required to help ease overcrowding and improve patient care.
The Solution
DATO Services delivered a full electrical installation within the required timeframe, ensuring the new patient units were fully operational as quickly as possible. The work included:
- Full electrical installation – Power and lighting designed to meet hospital standards.
- Emergency lighting installation – Essential backup lighting for patient and staff safety.
- Structured cabling – Ensuring connectivity for medical equipment and hospital systems.
The project was completed on schedule, allowing the hospital to start using the new beds without delay.
The Results
By delivering a fast and efficient electrical installation, DATO Services helped Surrey & Sussex Hospital expand its facilities when it was needed most.
Increased Capacity
The 64 new patient beds were operational as planned, easing hospital overcrowding.
Reliable Electrical Systems
The installation met healthcare safety standards, ensuring patient and staff safety.
Rapid Delivery Time
Despite the urgent timeline, DATO Services completed the work efficiently, allowing the hospital to provide better patient care without disruption.